Loading...
News2020-02-24T23:24:15+00:00

Fire Station #20 Soil and Groundwater Remediation

W hile working for a joint venture between Stillwater Technologies, E Sciences, Mr. Cook managed staff engineers and geologists who designed and supervised the installation of the longest horizontal biosparge system known to have ever been installed in Florida. The 1000-foot-long sparging system, which uses the injection of air through a series of underground pipes to remove hazardous contaminants from soil and groundwater, was installed at the site of a former underground fuel storage tank at O.C. Fire Station 20, located in Apopka, Florida. The [...]

By |Categories: Groundwater, Remediation, Soil|Tags: , |
Go to Top