Batac Towers (Site Assessment and Remediation)

While employed at another consulting firm Steve Cook directed, managed and assisted Batac Corporation with delineating soils impacted by hydraulic oils and remediating these impacted soils. Following remedial activities a soil and groundwater sampling plan was developed to obtain information for justifying a no further action status for the Site. To accomplish these objectives we [...]

By | 2018-01-08T16:46:07+00:00 December 8th, 2017|Groundwater, Remediation, Site Assessment, Soil|0 Comments

Walt Disney World Laundry Facility Assessment and Remediation

T his site is the subject of a Consent Order Agreement with the Florida Department of Environmental Protection (FDEP).  In March 1989, a perchloroethylene (PCE) filter ruptured and released approximately 150 gallons of PCE at one of the largest commercial laundries in the world.  PCE is a chemical substance that is more dense than [...]

By | 2018-01-08T17:33:24+00:00 June 30th, 2015|Groundwater, Remediation, Site Assessment, Soil|0 Comments

Hydrogeological Assessment Services

I n early 2001, several volatile organic compounds (VOCs) were detected in two of the City of Winter Springs’ five potable water supply wells. The supply wells are located near the western boundary of the City and provide 0.7 million gallons a day (gpd) of clean Floridan aquifer water to residents. Following discovery of [...]

By | 2018-01-08T18:04:37+00:00 June 30th, 2015|Groundwater, Water Resources|0 Comments

Newell’s Gas Station / Site Assessment

While working at another consulting firm our Principal Geologist was responsible for providing soil and groundwater evaluation services at the former Newell’s gas station in Altamonte Springs, Florida. Under the Florida Department of Environmental Protection’s Preapproval Petroleum Cleanup Program, this site was eligible for cleanup funding from the abandoned tank restoration program (ATRP). E Sciences [...]

By | 2018-01-08T18:44:26+00:00 July 31st, 2012|Groundwater, Site Assessment, Soil|0 Comments

Respite Center/Hartman Properties Phase I and II ESAs

This project involved two 40+ acre parcels in an industrial park to be utilized for expansion and improvement of City services. As part of these property acquisitions, we provided the following services: Phase I Environmental Site Assessments (ESAs) in accordance with ASTM Standard E-1527-00; and Phase II ESAs involving characterization of soil, groundwater and subsurface [...]

By | 2018-01-08T18:05:47+00:00 July 31st, 2012|Groundwater, Site Assessment, Soil|0 Comments

Winkler Tire Facility Underground Storage Tank Removal

While employed at another consulting firm, Mr. Cook directed a staff of engineers and geologists for the removal of a 2,000-gallon gasoline underground storage tank (UST), consistent with the requirements of Chapter 62-761 FAC. Services included the following: Performed permitting, prepared subcontract agreements and bid documents, and solicited bids from qualified Pollutant Storage System Specialty [...]

By | 2018-01-08T18:06:04+00:00 July 31st, 2012|Groundwater, Remediation, Site Assessment, Soil|0 Comments

Continuing Environmental Assessment and Remediation Services Contract

While employed at another consulting firm Mr. Cook had the responsibility of managing a staff of engineers and geologist who provided services for a continuing environmental assessment and remediation contract services to Orange County, Florida. Work completed included numerous task orders related to: Phase I and Phase II Environmental Site Assessments conducted in accordance with ASTM [...]

By | 2018-01-08T18:06:16+00:00 July 31st, 2012|Groundwater, Remediation, Site Assessment, Soil, Water Resources|0 Comments

Winter Springs Source Removal Action

During a routine compliance inspection of the City’s tank system, it was determined that the overfill protection device of a 10,000 gallon underground storage tank (UST) containing gasoline was damaged, resulting in the release of petroleum products through the overfill device over time. Upon this discovery and submission of a discharge notification form (DNF) to [...]

By | 2018-01-08T18:06:29+00:00 July 31st, 2012|Groundwater, Remediation, Site Assessment, Soil|0 Comments

Fire Station #20 Soil and Groundwater Remediation

While working for a joint venture between Stillwater Technologies, E Sciences, Mr. Cook managed a staff engineers and geologist who designed and supervised the installation of the longest horizontal biosparge system known to have ever been installed in Florida. The 1000-foot-long sparging system, which using the injection of air through a series of underground pipes [...]

By | 2018-01-08T18:06:42+00:00 July 31st, 2012|Groundwater, Remediation, Soil|0 Comments